Trenching – Sevenoaks
We were contacted to floor saw and break out a concrete yard slab to form a trench for a new gas supply pipe. Upon completion of the trench back fill…
We were contacted to floor saw and break out a concrete yard slab to form a trench for a new gas supply pipe. Upon completion of the trench back fill…
Some pre demolition saw cuts around some steel stanchions were not deep enough to sever the unknown concrete ground beam below. To enable a vibration free break out of the…
The end wall of a swimming pool required reducing in height with an angled cut to allow a free run for a new swimming pool cover.
An open joint behind some cladding panels on a roof level car park allowed rain water to run down behind the panels and over time cause failure of the concrete…
Four steel plates were positioned and levelled in a rebated floor slab in the loading bay of a heavy engineering factory. The <25mm void between the steel plate and the…