Diamond Track Sawing – Brenchley, Kent
The end wall of a swimming pool required reducing in height with an angled cut to allow a free run for a new swimming pool cover.
The end wall of a swimming pool required reducing in height with an angled cut to allow a free run for a new swimming pool cover.
An open joint behind some cladding panels on a roof level car park allowed rain water to run down behind the panels and over time cause failure of the concrete…
Four steel plates were positioned and levelled in a rebated floor slab in the loading bay of a heavy engineering factory. The <25mm void between the steel plate and the…
The edge of a ground bearing slab in a gas supply depot required removing to facilitate the installation of pipework. Given the sensitivity if the working environment and the lack…
Track sawing to form a lift and staircase opening through a 580mm thick r/c waffle floor slab. The centres being removed by drilling, bursting and breaking. All works were carried…