Floor Chasing – Tunbridge Wells Baptist Church
Invictacut were contracted to cut and break out a 20.00m long x 0.78m wide x 0.10m deep channel to enable power supplies to be run from the front of the…
Invictacut were contracted to cut and break out a 20.00m long x 0.78m wide x 0.10m deep channel to enable power supplies to be run from the front of the…
A contract was awarded to Invictacut on the North Kent coast which involved the floor sawing of a concrete promenade slab to enable a section of slab and sea wall…
Excessive shrinkage/movement on a housing development lead to variable degrees of failure to the mastic sealant around the UPVC window units. Work had to be planned to coincide with spells…
We were contracted to carry out the cutting and breaking out of a floor chase and the installation of an Acco drain - a standard type operation for Invictacut.
Our client was lacking a sea view from their Dungeness property so the neat cut out of a window in a no-fines concrete wall provided this together with some additional…